La Ceiba C.A.

Well intervention with 550 HP rigs, from planning to execution, with artificial lift and completion supplies.

We provide comprehensive technical support covering everything from planning to the execution of well interventions with 550 HP rigs. Our offer includes the supply and installation of artificial lift systems (sucker rod and PCP pumps), specialised maintenance workshop support and the guaranteed supply of wellheads and completion materials.

What backs us

The backing behind every operation

Technical capability and operating experience

Highly qualified operating and supervisory personnel, backed by solid prior experience and current certifications in the sector, guaranteeing maximum efficiency and safety on every project.

Operational traceability

We work under documented procedures, from the preliminary risk analysis and work-permit management to the delivery of detailed technical reports that guarantee traceability, safety and full control at every stage of the service.

Response capacity and field mobility

The logistics infrastructure and operating flexibility to mobilise equipment and personnel to any work front, guaranteeing minimum response times and a safe deployment on site.

Certified equipment

Certified, inspected equipment with maintenance up to date, under the standards that apply in the sector, guaranteeing operational availability.

Technical attention and operational support on request

Our engineering team will assess your requirements and prepare a technical proposal tailored to your needs.